Sign In  |  Register  |  About Pleasanton  |  Contact Us

Pleasanton, CA
September 01, 2020 1:32pm
7-Day Forecast | Traffic
  • Search Hotels in Pleasanton

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Helium One Global keen to get back up and running after unexpected rig outage

--News Direct--

Helium One Global Ltd (AIM:HE1, OTCQB:HLOGF) CEO Lorna Blaisse speaks to Thomas Warner after the AIM-listed Tanzanian explorer announced that its Predator 220 drilling rig suffered a component failure last night that has forced a temporary halt in its drill operations. Blaisse explains that the malfunction affected the power supply to the rig, necessitating a pause in drilling.

While such issues are not uncommon with large machinery, the geographical location poses challenges in quickly sourcing replacement parts. She remains optimistic, estimating a maximum downtime of two weeks, but hopes for a quicker resolution. Prior to the setback, drilling had been progressing as planned, with the team on the brink of reaching their first reservoir target. Blaisse confirmed that once repaired, drilling will resume from where it stopped, aiming to reach the total depth as swiftly and safely as possible. She concludes by saying that the dedicated team on-site is working tirelessly to rectify the situation.

Contact Details

Proactive UK Ltd

+44 20 7989 0813

uk@proactiveinvestors.com

View source version on newsdirect.com: https://newsdirect.com/news/helium-one-global-keen-to-get-back-up-and-running-after-unexpected-rig-outage-172289088

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Photography by Christophe Tomatis
Copyright © 2010-2020 Pleasanton.com & California Media Partners, LLC. All rights reserved.